Mahmoud Abdel Rahman – HRSG Contract and

Lead HRSG Completion amp; Commissioning Manager Arabian Bemco Contracting Co ‏يناير 2015 – ‏ديسمبر 2017 3 من الأعوام. KSA – Managed HRSG and auxiliary systems pre-, cold, and hot commissioning activities including hydrotesting, chemical cleaning, hot loop checking, steam blowing, and functional testing.

Combined Cycle Plant Steam Blow Overview

This may require multiple stages to perform the steam blows. Unlike basic steam boiler plants where the steam properties during the blow are controlled using throttling valves or devices, the control of steam properties during each stage of the blow is controlled by controlling the rate of water feed to the OTSG or HRSG.

Globchem » Reference

GlobChem works with the most prominent companies operating in the Oilamp;Gas and Power sector as well as EPC contractors and Government Authorities.

Steam Turbine, Steam Boiler, Power Plant, Steam

2019-11-4 · Steamforum.com, a forum on Steam Turbine, Steam Boiler, Power Plant, Steam Power, Steam Power Plant, HRSG, Supercritical boilers, Coal Fired Boilers and CCGT. Welcome to the steam and power forum. Here are question and answer to Steam Power Plant and Power Generation Plants for steam boilers, turbine generator and heating problems.

Mechanical Engineer experienced in

2019-11-9 · Experienced in Feed Water system, Condensate line, HRSG amp; Boiler Commissioning including Chemical Cleaning, Nitrogen Blanketing, Steam Blowing. Experienced in Boiler Auxiliaries Commissioning including, i. Fuel Oil System LDO/HFO Storage amp; Distribution System including High Pressure Screw Pumps amp; Heat Exchangers. ii.

experience with compressed air cleaning of main steam

2011-3-18 · This very ambitious construction and start-up schedule prompted the Allegheny Power System to evaluate and decide in favor of air-blowing in lieu of the customary steam-blowing to remove rust, debris, pipe scale, welding slag, etc. from the boiler and boiler

C.M.R.Dharma Raj – CCR operator – Cambdian engrey

Good knowledge and pre-commissioning commissioning experience in HRSG Boiler, Performed Hydro tests, Boiler chemical cleaning process, Boiler Steam Blowing. Familiar in commissioning activities for Gas turbine and steam Turbine – Lube oil flushing, Bypass operation etc. Directly responsible for Commissioning of Circulation water, Auxiliary

Commissioning Engineer Job in Home Based:

The Role: Our Client is currently searching for an experienced Commissioning Engineer to join the site based team in Darwin. The main objective of the role is to assist Combined Cycle Power Plant (CCPP) commissioning leader to supervise the pre-commissioning and commissioning efforts to timely completion within approved budget while achieving the required quality, HSES and environment standards.

Equipment Rental – Cogen Cleaning Global

The equipment has been designed to utilize as little setup area as possible and can be positioned next to the HRSG, Boiler, or Turbine without obstruction. Our sales and service staff have been involved in multiple new projects around the world and are knowledgeable experts in the commissioning of new equipment in the market.

Steam blowing procedure – SlideShare

Steam blowing procedure 1. TROMBAY TROMBAY UNIT 8 Steam Blowing Viren A. Joshi 1 2. TROMBAY ACTIVITIES BLOWING PURPOSE • The objective of steam blowing is to remove scales, loose material, iron cuttings etc, which are entrapped in Super Heaters, reheaters during manufacture, storage, erection at

Muhammad Nasir Abu Bakar – Technical Field

1) Lead Engineer (client representative)for an erection, installation and commissioning of Water Tube Boiler and Steam Turbine Extraction Condensing type. 2) Reviewed the test plan package on Hydrotest, Chemical Cleaning, Drying Out and Steam Blowing on behalf of client.

Steam Blowing Insights – Chemical Boiler S.L.

Chemical Boiler S.L. gt; Commissioning gt; Steam Blowing Insights. Commissioning. February 16, 2019 admin. Some Insights About Steam Blowing Introduction. The science behind steam blowing involves the optimization of the drag force of the steam and the chemical conditioning for corrosion control.

Mahmoud Abdel Rahman – HRSG Contract and

– Managed HRSG and auxiliary systems pre-, cold, and hot commissioning activities including hydrotesting, chemical cleaning, hot loop checking, steam blowing, and functional testing. – Controlled HRSG material in warehouse including operational and warranty spare parts.

Mahmoud Abdel Rahman – HRSG Contract and

View Mahmoud Abdel Rahman’s profile on LinkedIn, the world’s largest professional community. HRSG Contract and Commissioning Manager at OHL hot loop checking, steam blowing, and

Steam Blowing – Cogen Cleaning Global

An impulse steam blow takes many valves closing and openings to exhaust the steam at a good cleaning force ratio for only short sections at a time, whereas, a continuous steam blow the steam is always flowing and the cleaning force ratio becomes greater down the line as the pressure drops towards the exit. An impulse steam blow is just short puffs.

Muhammad Nasir Abu Bakar – Technical Field

1) Lead Engineer (client representative)for an erection, installation and commissioning of Water Tube Boiler and Steam Turbine Extraction Condensing type. 2) Reviewed the test plan package on Hydrotest, Chemical Cleaning, Drying Out and Steam Blowing on behalf of client.

Ariel Faustino De Guzman – Mechanical

Mechanical Commissioning Engineer (HRSG amp; Water Steam System) • Coordinating commissioning work including schedule follow-up and documentation, acceptance testing with customers and public authorities, testing, troubleshooting, implementing work permit procedures, defining tag-out and isolation measures for permits to work, coordinating installation/assembly activities after ECC hand-over.

Chemical Cleaning – Reliable Industrial Group

2019-11-4 · This mill scale removal minimizes tube failures during start up and improves heat transfer making the boiler/HRSG more efficient during operation. Chemical cleaning is appropriate for precommissioning and plant reliability maintenance. It is often used in conjunction with steam blowing, air blowing, or high velocity flushing services.

Jonathan Lomboy – Asst. Control Room Engineer –

– Gas Turbine, Steam Turbine, BOP (HRSG/Boiler, Natural Gas supply system, etc.) – Mechanical equipment testing amp; commissioning ( pumps, compressors, gas-fired heater, etc.) – Pipeline pre commissioning amp; commissioning (pigging, flushing, chemical cleaning, steam blowing, hydro test, pneumatic test/leak test, nitrogen

Heat Recovery Steam Generator – Wiki – odesie by

The function of the combined cycle heat recovery steam generator (HRSG) system is to provide a method to extract sensible heat from the combustion turbine (CT) exhaust gas stream. The heat is converted into usable steam by the heat transfer surfaces within the HRSG.